Evidence case

Türkiye → France
Iron & Steel

Quantity reconciliation, monitoring-plan versions and calculation trail

ProductHot-rolled steel coil, CN 7208 family
Regulatory cut-off3 September 2026
StatusIllustrative specimen

What this case demonstrates

This illustrative case shows how a CBAM file can become difficult to defend when the documents, quantities, versions or production links do not agree.

The producing installation and principal production records are present, but shipment tonnage, installation output and the calculation workbook do not close on one controlled population. The workbook also refers to a superseded monitoring-plan version without a preserved transition record.

Quantity reconciliation, monitoring-plan versions and calculation trail

Why this matters for CBAM review

A reviewer must be able to reproduce the declared value from a coherent population and understand which monitoring basis governed the relevant period.

A large file is not necessarily a reliable file. The records still need to agree on the goods, installation, period, quantities and calculation inputs. Any exception or version change should be explained in the file rather than left for a reviewer to infer.

This work can make accredited verification easier to prepare for. The verifier still performs its own independent procedures, but the supporting documents, unresolved issues and calculation trail are clearer before that work begins. This scenario shows that preparation; it does not replace verification.

Documentary records to reconcile

The review does more than check that documents are present. It checks whether they refer to the same goods, installation, period and calculation population, whether the correct versions were used, and whether another professional could follow how the reported result was reached.

  • customs and shipment quantities
  • installation production records
  • emissions calculation workbook
  • monitoring-plan versions and transition evidence

What the case shows

For importers, advisers and customs professionals, the useful output is not a score. It is a clear account of which relationships hold, which do not, and what still needs to be resolved before the file is relied on or prepared for verification.

How this case can be used

Use this case to see how the same type of issue can appear in a real file. The full PDF sets out the scenario, the relevant legal references and the detailed analysis.

installation-specific actual embedded emissions

Scope discipline

The scenario is illustrative. It does not describe a real client engagement, rank a country, supplier or sector, or predict acceptance by an accredited verifier or competent authority. Its conclusion applies only to the evidence described in the scenario.

Related CBAM review topics

CBAM documentary review before accredited verification & verification readiness
CBAM documentary review
Global CBAM Evidence Case Library

Download case PDF ↓

← Back to Case Library

Facing a similar issue? Start with the evidence you already have.

Request an Evidence Check